• <tfoot id="hmfdv"></tfoot>

    1. EN 中文
      當前頁面:首頁 >> NEWS >>  Company news
      汗汗漫畫首頁入口免閱幣_汗汗漫畫無限閱讀幣

      點擊:  添加時間:2018-06-15 17:17:46

      Xinsheng Hydropower Station was build in 1982 with 5 units 320kw Propeller type.

      It is built on the tunnel on the source of the drinking water of Chengdu city, which requires strictly requirement of the oil control. 


      The origional requirement of the owner is to generator 430kw per unit, but after the design of DSSD, it could generate 485kw per hour. The project also brought a high reputation of us. Thus the owner offered us an extra amout of money for praise.


      H:7.5m      Flow:5×8.3m3/s

      ZD***419-LH-120  SF500-20/1730

      situationoriginrequirementfinal
      output320kw430kw485kw



      1522154133221069.jpg













      上一篇:xxmh網站破解版免費閱讀在線_xxmh漫畫網站免閱幣
      下一篇:

      ADD: No.83, Tianshan South Road, Jingyang District, Deyang City,China

      Manager: Mr. Zhang Zhizhong

      Tel: +86 0838 2443007    Mobile: +86 137 0091 8663


      2015-2018 Deyang Dongsen Hydropower Equipment Co., Ltd. 





      官方微信
      第一av福利网,理论片国产 日韩 欧美,一级黄片中文免费观看,色欲色香亚洲综合夜夜福利 国产白浆精品永久网站 亚洲国产日韩欧美高清片
    2. <tfoot id="hmfdv"></tfoot>